![]() |
|||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||
|
The INSPECTION : FUNCTION OF CONTROL Conditions : The inspector has to visit each camp-site is : - in a systematic way to supplement the knowledge of it, - because our services perceived anomalies in professional practice of the camp-site thanks to : • a letter of notification of disappointed campers. • an insufficient mark of the Net surfers. - at the request of the owner of the camp-site. Who is concerned ? All French camp-sites fixed to the standards of prectorial classification of the campsites. (Ordrer of the prefect of 11 January 1993 relating to the well-equipped camp-site for the reception of the campers and the caravans; additional information to this phone number : (00.33) 01.40.58.78.78). The goal : The inspection of the camp-site is intended to grant a mark, the best possible one, corresponding to the criteria and the requirements of the campers and the Net surfers. The inspector : Can be an inspector, each european making the request to our services and having passed successfully the interview with the direction of the GUIDE DU CAMPING. Remuneration : Limited to 10 campings-sites/year for all the period from May 01 to September 30 of each year, the accredited inspector will be refunded expenses of camp-site at a rate of 10 euros/camping.. Work : The work of the inspector will be limited on each camp-site to : - Check and supplement the characteristics of the site. - Give a mark and justify its mark. - Make 6 photographs of the camp-site (numerical, exploitable and relevant), after agreement and signature of the owner of the camp-site. - Get from the owner of the camp-site an advertising text related with its ground to communicate it on Internet. The irreprochable behaviour of the inspector is essential and of primary importance for the credibility and the relevance of the site. For additional information call (00.33) 01.40.58.78.78 |
||||||||||||||||||||||||||
Copyright
©2002-2005 | Ingénierie-D tous droits réservés
| Limitation de responsabilité
• Contacter
Ingénierie-D ![]() |
|||||||||||||||||||||||||||